Prefabrication of GRP Pipes
Precise design in 2D and 3D and optimal workshop conditions make it possible for us to deliver all pipeline systems in the highest possible degree of prefabrication to the construction site. Aside from a shorter construction time, appropriately lower costs are the result of such an approach.