Seatrade Cruise Global from 05 – 08. March 2018

Seatrade 2017

For the third time we are presenting our GRP products at the Seatrade Cruise Global in Fort Lauderdale, the leading trade fair for the cruise industry. As in previous years, you can find us at booth no. 221 of our partner EMS European Metric Steel. We would be pleased to advise you on our products and services for the industry. We look forward to your visit!

FRP Unlimited – 06-07 February 2018

For the tenth time already, an interested expert audience will meet within the context of FRP Unlimited. At the conference, which is organised by TÜV SÜD, engineers, planners and plant constructors have the opportunity to exchange views on the various aspects of glass fibre reinforced plastics.
We present our company with our own company stand in the context of the exhibition, which takes place in addition to the lecture series. We would be pleased to inform you about our scope of services and our products and answer your questions.

FKT pipes under test

We are constantly evolving. In addition to the further development of existing products, FKT also focuses on the development of new products. For example, the product lines of MST and MAR pipes, special pipes suitable for use in shipbuilding, have been developed and established in recent years.
It goes without saying that our pipes are subject to repeated certification processes, which also make fire resistance tests a prerequisite. In August 2017, for example, our marine pipes in various nominal sizes were subjected to this test. The result: The tested pipes completely fulfilled the given criteria!

Exhibitions 2018

FKT Faßbender GmbH is represented at trade fairs again this year. In March, we will be represented for the third time in the USA with our products for shipbuilding at Seatrade Cruise Global. In addition, you will find us for the first time with our own exhibition booth at SMM Hamburg, the renowned international trade fair for maritime industry, in September. The trade fair season will open for us in February. On February 06th and 07th we present our products to the conference audience at the GFK Unlimited in Munich.

Exhibition Dates 2018:
February 06th – 07th GFK Unlimited – Munich, Germany
March 06th – 08th Seatrade Cruise Global – Fort Lauderdale, Florida, USA
September 04th – 07th SMM Hamburg – Hamburg, Germany

Seatrade Criuse Global from 13. – 16. March 2017

Seatrade 2017

In this year we will be present at the leading exhibition of the cruise industry again – the Seatrade Cruise Global in Fort Lauderdale, Florida. At the booth of our partner EMS European Metric Steel we inform about our products and services for the industry in the second year now. We are looking forward to your visit at the booth in the Broward County Convention Center!

Major project Egypt

The FKT Faßbender GmbH has come out as winner of the placing of a major contract by Siemens. For Siemens itself the already in 2015 commissioned project is the largest in company history. With the construction of wind farms, which will have a capacity of 2 gigawatt, and the construction of three combined gas and steam power plants, with a capacity of 4.8 gigawatt each, the project includes an increase in power supply of about 50 % for Egypt.

The FKT delivers the main as well as the secondary cooling water pipelines for altogether 12 blocks of the gas and steam power plants in Burullus, Beni Suef and New Capital. The delivery includes GRP pipes and fittings in nominal diameters 25 – 2,600, produced in our factories in Draschwitz and in Poland.

The first step of electricity feed-in is planned for winter 2016 / 2017 already. After completion of construction the gas and steam power plants will be the largest ones worldwide.

FKT featured on Seatrade Cruise Global

In March FKT Faßbender featured on the leading international fair of the cruise industry in Fort Lauderdale, Florida. Our products were presented at the booth of our partner EMS European Metric Steel. Besides the possibility to inform oneself about FKT guests could also look closely at some samples of our products.

Dublin Waste to Energy Project

A current project the FKT Faßbender is involved in is the construction of the waste-to-energy plant in Ireland’s capital Dublin. The Plant will generate electricity from 600,000 tonnes of waste per year for up to 80,000 and district heating for up to 50,000 homes after completion in 2017.

The FKT manufactures and delivers the cooling water pipes and the supporting steel construction and assembles the components. Overall there are almost 1,200 m of pipe in DN 150 – 1,300 mm and 90 tonnes of steel needed for the construction of the plant.

Project:
Vlient:
Operator:
Components:
Medium:
Nominal diameter:
Year of construction:
Waste-To-Energy- Plant Dublin
Hitachi Zosen INOVA
COVANTA
GRP pipelines, supporting steel construction
Cooling water
DN 150 – 1,300 mm
Since 2015

FKT Faßbender at leading international fair of the cruise industry

The leading international fair of the cruise industry, Seatrade Cruise Global, takes place in Fort Lauderdale, Florida, from 14. March to 17. March. It features exhibitors from all areas of the industry such as shipbuilding, entertainment, food & beverage or tour operations. Additionally the conference program provides various presentations by knowledgable speakers.

We are represented at the exhibition by our partner EMS European Metric Steel and inform about our products and services for the industry. A visit of the booth affords the opportunity to get a close look at our products and receive expert advise. Feel free to visit us. We are looking forward to meet you!

FKT extends product range to nominal diameters up to 4.000 mm

The FKT Faßbender has undertaken the engineering, production and prefabrication of the primary and secondary cooling water pipes oft he coal-fired power plant Opole in Poland. The expansion of the existing power plant with an installed capacity of 1,492 megawatt includes the new construction of two more blocks with an additional capacity of 900 megawatt each.

Parallel to this order FKT extended the product range from previous nominal diameters up to 2,000 mm to nominal diameters up to 4,000 mm now. Accordingly the pipes with DN 3,400 mm which are used in the expansion of the power plant could be manufactured in in-house production fort he first time.

Project:
Client:
Operator:
Components:
Medium:
Nominal diameter:
Year of realisation:
Power Plant Opole
General Electric (formely Alstom)
PGE Polska Grupa Energetyczna S.A.
GRP pipelines
Cooling water
25 – 3.400 mm
2015 / 2016
  • HOME
  • NEWS
  • FKT
    • OUR LOCATIONS
    • EMPLOYEES AND ENVIRONMENT
  • OUR SERVICES
    • ENGINEERING
    • PRODUCTION
    • PREFABRICATION
    • ASSEMBLY
  • GRP-PRODUCTS
    • GRP AS MATERIAL
    • USE OF GRP PIPE SYSTEMS
    • OVERVIEW OF FKT’s PIPE SYSTEMS
  • REFERENCES
    • POWER PLANTS, FGD PLANTS, WASTE INCINERATION PLANTS
    • POWER PLANTS – COOLING WATER PIPES
    • SPRAYING PIPES FOR POWER PLANTS
    • GENERAL PLANT CONSTRUCTION, CHEMISTRY AND REFINERIES
    • SHIPBUILDING
    • FIRE-EXTINGUISHING SYSTEMS
  • REFERENCES IN IMAGES
    • POWER PLANTS, FGD PLANTS AND WASTE INCINERATION PLANTS
    • POWER PLANTS – COOLING WATER PIPES
    • SPRAYING PIPES FOR POWER PLANTS
  • LICENSES AND CERTIFICATES
  • DOWNLOADS
  • CONTACT
© Copyright FKT Faßbender GmbH - 2015 . Alle Rechte vorbehalten.

[ Placeholder content for popup link ] WordPress Download Manager - Best Download Management Plugin